BHS Announces Medical Arts Complex Construction

Staff Reports Print Story | Email Story
PITTSFIELD, Mass. — Berkshire Health Systems (BHS) announced plans for work on the mechanical infrastructure of the Medical Arts Complex (MAC) to ensure the building's longstanding sustainability as a center for outpatient care. 
 
This work is a demonstration of BHS's continued investment in the health of Berkshire County, as part of its vision to be the region's trusted healthcare partner and community advocate for improving overall quality of life.
 
"Here at Berkshire Health Systems, we take pride in not only being the leading healthcare provider in Berkshire County but also investing in the health of our community," said Darlene Rodowicz, BHS president and CEO. "Taking this step to preserve the MAC's future sustainability is one of many investments we're proud to make in the system as a whole."
 
Construction at the MAC will begin on Sept. 5, 2023, following the Labor Day Holiday and is expected to last for 12 months. Work on the heating, ventilation, and air conditioning, (HVAC) systems will impact the way that people enter the building.
 
The front, upper-level entrance of the MAC Building that is typically accessed from the parking lot will be closed. All patients, visitors, and staff should plan to access the building from the rear (West) using either the ground floor entrance or the second-floor walkway from the parking garage. 
 
The patient parking lot at the front of the building will remain open with a modified driveway entrance. BHS will offer valet parking, extensive shuttle service to the rear door, and a modified sidewalk to allow access to the rear of the building to help patients and visitors adapt to the entry changes. Additional accessible parking will also be available near the rear entrance. Visit berkshirehealthsystems.org/MACProject to view a walking guide and map.
 
"The current MAC building was constructed in 1990. In the 33 years since, the building has welcomed thousands of patients through its doors," said Chris Camillo, Vice President of Physician Services and leader of the BHS medical group of clinics, many of which are housed in the MAC. "By taking this step, we are ensuring that the MAC remains positioned to serve our patients, today and for years to come."
 
 
 

Tags: BHS,   BMC,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Dalton Planning Board Establishes Sidewalk Subcommittee

By Sabrina DammsiBerkshires Staff
DALTON, Mass. — The Planning Board established a sidewalk subcommittee during its meeting last week. 
 
The subcommittee will review the proposed sidewalk bylaw amendment that was not acted upon during the annual town meeting on May 7. 
 
The amendment proposes amending the town bylaw to make concrete sidewalks the standard.
 
During the meeting, Todd Logan, the citizen petitioner for the sidewalk amendment, reiterated what he had previously said during several meetings — that concrete sidewalks should be the standard — and presented the steps he had already taken while developing this amendment. 
 
"The way the proper way to do this is to have a subcommittee and have at least two people from the Planning Board, and you can have as many people as you want that are experts … and write the bylaw in the format that matches our bylaws," Planner Zack McCain said during the meeting. 
 
"Then the whole Planning Board will review it, and then we'd have a public hearing to let everybody have their input on it. And then we would make the changes based on the input and then have it go to the annual town meeting."
 
McCain is the voter who motioned during the town meeting to table the article until a public hearing. 
 
View Full Story

More Pittsfield Stories